Floor Sanding & Fitting
Book Free Visit Price Guide 020 88309782
Monday - Friday 07:30 - 17:30, Saturday 07:30 - 16:00
cs@flooringfirst.co.uk
020 88309782
Monday - Friday 07:30 - 17:30, Saturday 07:30 - 16:00
cs@flooringfirst.co.uk
  • Book Free Visit
  • Home
  • Floor Sanding
  • Floor Fitting
  • Floor Repairs
  • Aftercare
    • Wooden Floors
    • Cleaning & Polishing
    • Re-Oiling Wooden Floors
    • Vinyls & Linoleum
    • Vinyl Floor Polishing
    • Get a Quote...
  • For Businesses
  • Gallery
  • Service Guide
  • Shop
  • Book Free Visit

See Few Examples of Our Works

Floor Sanding, Solid, Parquet & Laminate Floor Fitting

Gallery

See Our Floor Works

WHY CHOOSE US
CASE STUDIES
PRICE GUIDE
OFFERS
GALLERY
ASK EXPERT
WHY CHOOSE US
CASE STUDIES
PRICE GUIDE
OFFERS
GALLERY
ASK EXPERT

Floor Sanding & Fitting Project Gallery

All Projects Renovations Installations

5  |   South Norwood  |   April 2023

Laminate flooring in South Norwood, SE25 was laid with careful planning and accurate board positioning. The finished floor has a smooth, consistent appearance with a durable surface suited for everyday use.

Case studies

Project Overview

This project involved the professional installation of laminate flooring at a property in South Norwood, SE25. The client required a quality floor that would stand up to daily use and complement their interior. Our fitting team assessed the subfloor condition, carried out any necessary preparation work, and fitted the new floor to a high standard.

Before the Work

Prior to installation, the existing floor covering was inspected and the subfloor was prepared to ensure it was flat, dry, and suitable for the new laminate. Any existing floor covering was lifted and disposed of cleanly before the fitting work began.

Survey photos showing the floor condition before work:

Floor condition before work at SE25 Floor condition before work at SE25 Floor condition before work at SE25

Our Approach

The following services were carried out as part of this project:

  • Stairs Step Fitting (Laminate)
  • Stair Nosing Installation ( excl materials) 14

The Result

The completed laminate installation looked clean and finished throughout. Joins are tight, edges are neat, and the floor sits flat and stable. Beading and threshold strips were fitted where required to complete the job properly. The client was pleased with both the quality of the work and the appearance of the new floor.

Photos of the completed work:

Laminate floor after fitting work in SE25 Laminate floor after fitting work in SE25 Laminate floor after fitting work in SE25

Frequently Asked Questions

How long does laminate installation take?
Most fitting jobs are completed within one to two days. Larger areas or more detailed layouts such as herringbone patterns take longer due to the additional cutting and positioning involved.

Do I need underlay?
Yes, underlay is required for most floor types and helps with insulation, sound deadening, and levelling minor subfloor imperfections. We can supply and fit appropriate underlay as part of the installation.

How much does floor fitting cost in London?
Fitting costs typically range from £35 to £60 per square metre depending on floor type and complexity. We provide a full written quote before starting any work.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close
5  |   Southeast London  |   April 2023

We installed laminate flooring in South East London, SE16, laying each board with accurate alignment and tight joins. The finished surface delivers a smooth, consistent look with a durable, hard-wearing finish suited for everyday use.

Case studies

Project Overview

This project involved the professional installation of laminate flooring at a property in South East London, SE16. The client required a quality floor that would stand up to daily use and complement their interior. Our fitting team assessed the subfloor condition, carried out any necessary preparation work, and fitted the new floor to a high standard.

Before the Work

Prior to installation, the existing floor covering was inspected and the subfloor was prepared to ensure it was flat, dry, and suitable for the new laminate. Any existing floor covering was lifted and disposed of cleanly before the fitting work began.

Survey photos showing the floor condition before work:

Floor condition before work at SE16 Floor condition before work at SE16

Our Approach

The following services were carried out as part of this project:

  • Beading Installation (incl. materials)
  • Doors Plus Frame Trimming (per door)
  • Floorboards - Replacement (incl. materials)
  • Laminate Floor Installation
  • Thresholds & Fitting (inc. materials)
  • Duralay Timbermate Excel Silver Wood Floor & Laminate Underlay
  • Traditions Orchard Oak Laminate Flooring, 8 mm

The Result

The completed laminate installation looked clean and finished throughout. Joins are tight, edges are neat, and the floor sits flat and stable. Beading and threshold strips were fitted where required to complete the job properly. The client was pleased with both the quality of the work and the appearance of the new floor.

Photos of the completed work:

Laminate floor after fitting work in SE16 Laminate floor after fitting work in SE16 Laminate floor after fitting work in SE16

Frequently Asked Questions

How long does laminate installation take?
Most fitting jobs are completed within one to two days. Larger areas or more detailed layouts such as herringbone patterns take longer due to the additional cutting and positioning involved.

Do I need underlay?
Yes, underlay is required for most floor types and helps with insulation, sound deadening, and levelling minor subfloor imperfections. We can supply and fit appropriate underlay as part of the installation.

How much does floor fitting cost in London?
Fitting costs typically range from £35 to £60 per square metre depending on floor type and complexity. We provide a full written quote before starting any work.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close
6  |   West Norwood  |   March 2023

Engineered wood flooring in West Norwood, SE27 was installed with careful layout planning and precise board placement. The finished surface offers a smooth, consistent look with strong stability for everyday use.

Case studies

Project Overview

This project involved the professional installation of engineered wood flooring at a property in West Norwood, SE27. The client required a quality floor that would stand up to daily use and complement their interior. Our fitting team assessed the subfloor condition, carried out any necessary preparation work, and fitted the new floor to a high standard.

Before the Work

Prior to installation, the existing floor covering was inspected and the subfloor was prepared to ensure it was flat, dry, and suitable for the new engineered wood. Any existing floor covering was lifted and disposed of cleanly before the fitting work began.

Survey photos showing the floor condition before work:

Floor condition before work at SE27 Floor condition before work at SE27 Floor condition before work at SE27

Our Approach

The following services were carried out as part of this project:

  • Door Frame Trimming
  • Engineered Flooring Installation

The Result

The completed engineered wood installation looked clean and finished throughout. Joins are tight, edges are neat, and the floor sits flat and stable. Beading and threshold strips were fitted where required to complete the job properly. The client was pleased with both the quality of the work and the appearance of the new floor.

Photos of the completed work:

Engineered Wood floor after fitting work in SE27 Engineered Wood floor after fitting work in SE27 Engineered Wood floor after fitting work in SE27

Frequently Asked Questions

How long does engineered wood installation take?
Most fitting jobs are completed within one to two days. Larger areas or more detailed layouts such as herringbone patterns take longer due to the additional cutting and positioning involved.

Do I need underlay?
Yes, underlay is required for most floor types and helps with insulation, sound deadening, and levelling minor subfloor imperfections. We can supply and fit appropriate underlay as part of the installation.

How much does floor fitting cost in London?
Fitting costs typically range from £35 to £60 per square metre depending on floor type and complexity. We provide a full written quote before starting any work.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close
6  |   North Kensington  |   March 2023

Laminate flooring in North Kensington, W10 was laid with precise alignment and careful edge detailing. The finished surface presents a smooth, consistent look with a durable finish suited for everyday use.

Case studies

Project Overview

This project involved the professional installation of laminate flooring at a property in North Kensington, W10. The client required a quality floor that would stand up to daily use and complement their interior. Our fitting team assessed the subfloor condition, carried out any necessary preparation work, and fitted the new floor to a high standard.

Before the Work

Prior to installation, the existing floor covering was inspected and the subfloor was prepared to ensure it was flat, dry, and suitable for the new laminate. Any existing floor covering was lifted and disposed of cleanly before the fitting work began.

Survey photos showing the floor condition before work:

Floor condition before work at W10 Floor condition before work at W10 Floor condition before work at W10

Our Approach

The following services were carried out as part of this project:

  • Beading Installation (excl. materials)
  • Doors Plus Frame Trimming (per door)
  • Furniture Moving
  • Kitchen Plinths Trimming
  • Laminate Floor Installation
  • Lift & Dispose Carpets or Laminates
  • Stairs Step Fitting (Laminate)
  • Thresholds & Fitting (inc. materials)
  • Extra Repairs

The Result

The completed laminate installation looked clean and finished throughout. Joins are tight, edges are neat, and the floor sits flat and stable. Beading and threshold strips were fitted where required to complete the job properly. The client was pleased with both the quality of the work and the appearance of the new floor.

Photos of the completed work:

Laminate floor after fitting work in W10 Laminate floor after fitting work in W10 Laminate floor after fitting work in W10

Frequently Asked Questions

How long does laminate installation take?
Most fitting jobs are completed within one to two days. Larger areas or more detailed layouts such as herringbone patterns take longer due to the additional cutting and positioning involved.

Do I need underlay?
Yes, underlay is required for most floor types and helps with insulation, sound deadening, and levelling minor subfloor imperfections. We can supply and fit appropriate underlay as part of the installation.

How much does floor fitting cost in London?
Fitting costs typically range from £35 to £60 per square metre depending on floor type and complexity. We provide a full written quote before starting any work.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close
6  |   Hackney  |   February 2023

We installed hardwood flooring in Hackney, E8, positioning each board with precision to achieve a balanced layout and tight joins. The finished surface offers a smooth, natural look with a solid feel suited for everyday use.

Case studies

Project Overview

This project involved the professional installation of hardwood flooring at a property in Hackney, E8. The client required a quality floor that would stand up to daily use and complement their interior. Our fitting team assessed the subfloor condition, carried out any necessary preparation work, and fitted the new floor to a high standard.

Before the Work

Prior to installation, the existing floor covering was inspected and the subfloor was prepared to ensure it was flat, dry, and suitable for the new hardwood. Any existing floor covering was lifted and disposed of cleanly before the fitting work began.

Survey photos showing the floor condition before work:

Floor condition before work at E8 Floor condition before work at E8 Floor condition before work at E8

Our Approach

The following services were carried out as part of this project:

  • Hardwood Installation, Access Panel Fitting

The Result

The completed hardwood installation looked clean and finished throughout. Joins are tight, edges are neat, and the floor sits flat and stable. Beading and threshold strips were fitted where required to complete the job properly. The client was pleased with both the quality of the work and the appearance of the new floor.

Photos of the completed work:

Hardwood floor after fitting work in E8 Hardwood floor after fitting work in E8 Hardwood floor after fitting work in E8

Frequently Asked Questions

How long does hardwood installation take?
Most fitting jobs are completed within one to two days. Larger areas or more detailed layouts such as herringbone patterns take longer due to the additional cutting and positioning involved.

Do I need underlay?
Yes, underlay is required for most floor types and helps with insulation, sound deadening, and levelling minor subfloor imperfections. We can supply and fit appropriate underlay as part of the installation.

How much does floor fitting cost in London?
Fitting costs typically range from £35 to £60 per square metre depending on floor type and complexity. We provide a full written quote before starting any work.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close
5  |   Croydon  |   February 2023

We installed laminate flooring in Croydon, SE25, setting out the boards with accurate alignment and neatly finished edges. The completed surface has a smooth, uniform look with a durable finish suited for everyday use.

Case studies

Project Overview

This project involved the professional installation of laminate flooring at a property in Croydon, SE25. The client required a quality floor that would stand up to daily use and complement their interior. Our fitting team assessed the subfloor condition, carried out any necessary preparation work, and fitted the new floor to a high standard.

Before the Work

Prior to installation, the existing floor covering was inspected and the subfloor was prepared to ensure it was flat, dry, and suitable for the new laminate. Any existing floor covering was lifted and disposed of cleanly before the fitting work began.

Survey photos showing the floor condition before work:

Floor condition before work at SE25 Floor condition before work at SE25 Floor condition before work at SE25

Our Approach

The following services were carried out as part of this project:

  • Beading Installation (incl. materials)
  • Doors Plus Frame Trimming (per door)
  • Laminate Floor Installation
  • Thresholds & Fitting (inc. materials)

The Result

The completed laminate installation looked clean and finished throughout. Joins are tight, edges are neat, and the floor sits flat and stable. Beading and threshold strips were fitted where required to complete the job properly. The client was pleased with both the quality of the work and the appearance of the new floor.

Photos of the completed work:

Laminate floor after fitting work in SE25 Laminate floor after fitting work in SE25 Laminate floor after fitting work in SE25

Frequently Asked Questions

How long does laminate installation take?
Most fitting jobs are completed within one to two days. Larger areas or more detailed layouts such as herringbone patterns take longer due to the additional cutting and positioning involved.

Do I need underlay?
Yes, underlay is required for most floor types and helps with insulation, sound deadening, and levelling minor subfloor imperfections. We can supply and fit appropriate underlay as part of the installation.

How much does floor fitting cost in London?
Fitting costs typically range from £35 to £60 per square metre depending on floor type and complexity. We provide a full written quote before starting any work.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close
3  |   Stoke Newington  |   January 2023

We fitted laminate flooring in Stoke Newington, N16, laying each board with careful alignment and tight joins throughout. The finished surface delivers a smooth, consistent look with a hard-wearing finish suited for everyday use.

Case studies

Project Overview

This project involved the professional installation of laminate flooring at a property in Stoke Newington, N16. The client required a quality floor that would stand up to daily use and complement their interior. Our fitting team assessed the subfloor condition, carried out any necessary preparation work, and fitted the new floor to a high standard.

Before the Work

Prior to installation, the existing floor covering was inspected and the subfloor was prepared to ensure it was flat, dry, and suitable for the new laminate. Any existing floor covering was lifted and disposed of cleanly before the fitting work began.

Our Approach

The following services were carried out as part of this project:

  • Laminate Floor Installation

The Result

The completed laminate installation looked clean and finished throughout. Joins are tight, edges are neat, and the floor sits flat and stable. Beading and threshold strips were fitted where required to complete the job properly. The client was pleased with both the quality of the work and the appearance of the new floor.

Photos of the completed work:

Laminate floor after fitting work in N16 Laminate floor after fitting work in N16 Laminate floor after fitting work in N16

Frequently Asked Questions

How long does laminate installation take?
Most fitting jobs are completed within one to two days. Larger areas or more detailed layouts such as herringbone patterns take longer due to the additional cutting and positioning involved.

Do I need underlay?
Yes, underlay is required for most floor types and helps with insulation, sound deadening, and levelling minor subfloor imperfections. We can supply and fit appropriate underlay as part of the installation.

How much does floor fitting cost in London?
Fitting costs typically range from £35 to £60 per square metre depending on floor type and complexity. We provide a full written quote before starting any work.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close
7  |   Greenwich  |   December 2022

Vinyl flooring brings with it a multitude of benefits such as its durability, affordability and great look. We were recently given the opportunity to install vinyl flooring in a beautiful home in Greenwich.

Case studies
  • Vinyl Floor Installation in Greenwich 6
  • Vinyl Floor Installation in Greenwich
  • Vinyl Floor Installation in Greenwich 1
  • Vinyl Floor Installation in Greenwich 2
  • Vinyl Floor Installation in Greenwich 3
  • Vinyl Floor Installation in Greenwich 4
  • Vinyl Floor Installation in Greenwich 5

Project Overview

This project in Greenwich involved removing old carpeting and installing a new vinyl floor throughout the property. Vinyl flooring has grown significantly in popularity over recent years, offering excellent value, durability, and a wide range of looks. Fitting costs for vinyl typically sit between £35 and £55 per square metre, including subfloor preparation and underlayment.

Vinyl Floor Installation in Greenwich

The Challenge

We started by clearing out the existing carpeting and giving the subfloor a thorough clean before beginning the installation. Old carpeting can leave adhesive residue, tack strips, and uneven spots that need addressing before a new floor can go down properly. Once the subfloor was clear and clean, an underlayment was installed to provide a stable, even base and to help protect the vinyl from moisture and any minor subfloor imperfections. With those steps done, we began laying the vinyl planks.

Vinyl Floor Installation in Greenwich 1

Our Approach

  • Carpet removal and disposal: The existing carpet and underlay were lifted and removed from the property. Tack strips around the perimeter were taken out and the subfloor was swept and inspected for level.
  • Subfloor preparation: Any raised spots, dips, or gaps in the subfloor were addressed before the underlayment went down. A flat, clean base is essential for vinyl — even small imperfections can telegraph through a thin plank over time.
  • Underlayment installation: A quality underlayment was fitted to improve the feel underfoot, reduce noise, and provide a moisture barrier between the subfloor and the new vinyl.
  • Vinyl plank laying: Planks were laid starting from a straight reference line and worked outward across the room. Each plank was clicked or adhered into place according to the product specification, with cuts made carefully around architraves and door frames.
  • Finishing details: Threshold strips and beading were fitted at perimeters and transitions to give the installation a tidy, complete appearance.
Vinyl Floor Installation in Greenwich 2

The Result

The result was a significant improvement on the old carpeting. The team worked carefully to make sure every plank was correctly seated before moving on. Vinyl floors offer tremendous value — they are durable, easy to maintain, warm underfoot compared to tile, and available in realistic wood and stone effects. This Greenwich home now has a floor that looks attractive, performs well in daily use, and will be straightforward to keep clean for years to come.

Frequently Asked Questions

Q: What is the difference between LVT and standard vinyl flooring?
A: LVT (luxury vinyl tile) is a thicker, more structured product that comes in plank or tile formats and is designed to replicate the look of wood or stone more convincingly than traditional vinyl sheet. Standard vinyl sheet is thinner and suited to areas where cost is the priority. Most residential projects we carry out use LVT planks due to their durability and appearance.

Q: Can vinyl flooring be installed over existing tiles?
A: In some cases yes, provided the tiles are flat, firmly adhered, and the height difference will not cause issues at doorways. If tiles are cracked or loose, they need to come up first. We assess this during our initial visit.

Q: How long does vinyl flooring last?
A: Quality LVT with a good wear layer — 0.55mm or above — can last 15 to 25 years in domestic use with normal maintenance. The floor is waterproof, so it handles spills and damp conditions well, which makes it a popular choice for kitchens, bathrooms, and hallways.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close
3  |   Welling  |   December 2022

We replaced the existing floor and installed new engineered wood in Welling, DA16, ensuring accurate board layout and tight, consistent joins. The finished surface has a clean, uniform appearance with a stable structure suited for everyday use.

Case studies

Project Overview

This project involved the professional installation of engineered wood flooring at a property in Welling, DA16. The client required a quality floor that would stand up to daily use and complement their interior. Our fitting team assessed the subfloor condition, carried out any necessary preparation work, and fitted the new floor to a high standard.

Before the Work

Prior to installation, the existing floor covering was inspected and the subfloor was prepared to ensure it was flat, dry, and suitable for the new engineered wood. Any existing floor covering was lifted and disposed of cleanly before the fitting work began.

Our Approach

The following services were carried out as part of this project:

  • Door Frame Trimming
  • Doors Plus Frame Trimming (per door)
  • Engineered Flooring Installation
  • Lift & Dispose Carpets or Laminates
  • Thresholds & Fitting (inc. materials)

The Result

The completed engineered wood installation looked clean and finished throughout. Joins are tight, edges are neat, and the floor sits flat and stable. Beading and threshold strips were fitted where required to complete the job properly. The client was pleased with both the quality of the work and the appearance of the new floor.

Photos of the completed work:

Engineered Wood floor after fitting work in DA16 Engineered Wood floor after fitting work in DA16 Engineered Wood floor after fitting work in DA16

Frequently Asked Questions

How long does engineered wood installation take?
Most fitting jobs are completed within one to two days. Larger areas or more detailed layouts such as herringbone patterns take longer due to the additional cutting and positioning involved.

Do I need underlay?
Yes, underlay is required for most floor types and helps with insulation, sound deadening, and levelling minor subfloor imperfections. We can supply and fit appropriate underlay as part of the installation.

How much does floor fitting cost in London?
Fitting costs typically range from £35 to £60 per square metre depending on floor type and complexity. We provide a full written quote before starting any work.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close
5  |   Greenwich  |   November 2022

Laminate flooring in Greenwich, SE10 was installed with precise board alignment and carefully finished edges. The completed surface offers a clean, uniform appearance with a durable finish suited for everyday use.

Case studies

Project Overview

This project involved the professional installation of laminate flooring at a property in Greenwich, SE10. The client required a quality floor that would stand up to daily use and complement their interior. Our fitting team assessed the subfloor condition, carried out any necessary preparation work, and fitted the new floor to a high standard.

Before the Work

Prior to installation, the existing floor covering was inspected and the subfloor was prepared to ensure it was flat, dry, and suitable for the new laminate. Any existing floor covering was lifted and disposed of cleanly before the fitting work began.

Survey photos showing the floor condition before work:

Floor condition before work at SE10 Floor condition before work at SE10

Our Approach

The following services were carried out as part of this project:

  • Door Frame Trimming
  • Lift & Dispose Carpets or Laminates
  • Vinyl Installation
  • Silicone Application around perimeter

The Result

The completed laminate installation looked clean and finished throughout. Joins are tight, edges are neat, and the floor sits flat and stable. Beading and threshold strips were fitted where required to complete the job properly. The client was pleased with both the quality of the work and the appearance of the new floor.

Photos of the completed work:

Laminate floor after fitting work in SE10 Laminate floor after fitting work in SE10 Laminate floor after fitting work in SE10

Frequently Asked Questions

How long does laminate installation take?
Most fitting jobs are completed within one to two days. Larger areas or more detailed layouts such as herringbone patterns take longer due to the additional cutting and positioning involved.

Do I need underlay?
Yes, underlay is required for most floor types and helps with insulation, sound deadening, and levelling minor subfloor imperfections. We can supply and fit appropriate underlay as part of the installation.

How much does floor fitting cost in London?
Fitting costs typically range from £35 to £60 per square metre depending on floor type and complexity. We provide a full written quote before starting any work.

Have a similar project? Call us on 020 88309782 or Book a Free Site Visit

Close

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

Have a similar project?

Call us on 020 88309782 or book a free site visit

Book Free Site Visit

Our Flooring Company

Contacts & Showroom Book Free Site Survey About Our Flooring Company Join Our Team Work as a Contractor

Service Information

Terms of Service Terms of Sales Deliveries & Charges Cookie Settings Returns Policy Privacy Policy

Help

FAQs Case Studies Sitemap Glossary
𝕏
FlooringFirst! Services
158 Coles Green Road
London, NW2 7HW
T: 020 88309782
Floor Sanding Services: Central London, East London, Near London, North London, Northwest London, Southeast London, Southwest London, West London
Wood Floor Installation Service: Central London, East London, Near London, North London, Northwest London, Southeast London, Southwest London, West London

  • Flooring Services
  • Floor Sanding
    • Wood Floor Staining
    • Wood Floor Gap Filling
    • Commercial Floor Sanding
    • Engineered Floor Sanding & Refinishing
  • Wood Floor Fitting
    • Parquet Floor Installation
    • Laminate Floor Installation
    • Engineered Wood Floor Installation - Supply & Fit
    • Solid Wood Floor Fitting - Supply & Fit
    • LVT Floor Installation - Supply & Fit
  • Floor Repairs
    • Parquet Floor Repair and Restoration
    • Engineered Wood Floor Repairs
    • Wood Floor Scratch Repair
    • Floorboards Replacement
  • Care & Maintenance
    • Re-Oiling & Recoating Oiled Floors
    • Vinyl & Linoleum Cleaning
    • Hardwood Floor Buffing
    • Wood Floor Polishing
  • Shop
  • Shop
  • Gallery
  • Service Guide
  • Bookings
  • Book Free Survey
  • Service Advice
  • Product Advice