Ask The Expert

Get Advice From The Flooring Expert

How Long Does Professional Floor Sanding Take?

How long does it take a professional to sand a wooden floor?

 


On average, a professional can sand between 15 to 20 square metres per day. However, the exact duration varies based on several factors, including the condition of the floor, the type of wood, the layout of the room, and the equipment being used. For example, heavily damaged or uneven floors will take longer to prepare and sand properly. Tight spaces, corners, and staircases can also slow down the process. A simple room in good condition might be done in a day, while more complex jobs could take several days.


Our Flooring Topics:

 Wood Floor Sanding
 Wood Floor Finishing & Staining
 Stairs Stripping & Restoration
 Installation of Engineered Flooring
 Installation of Reclaimed Flooring
 Moisture and Water Leaks Damaged Floors
 Installation of Solid Wood Flooring

Ask Your Question:

How Would You Relate It?

Your Name
Location
Your Email Address
I agree, my question to be pusblished on FlooringFirst's website.
FlooringFirst! Services
158 Coles Green Road
London, NW2 7HW
T: 020 88309782