Project Details
This is a study case from one of our recent projects. We had to supply and install approx. 62 sqm of oak engineered flooring in rustic grade and 70 linear meters of prefinished beading. The planks were also prefinished with hardwearing sealant from the manufacturer – Kersaint Cobb.
This project took our guys 2 days, which included also trimming the door frames to adjust their size to the new flooring level. On the site visit prior to starting the project, our surveyor inspected the level and condition of the subfloor because it’s crucial for the solidness of the floating installation. In fact, subfloor preparation is part of the fitting process that determines the success of the entire project.
In this case, floorboards condition was good enough so they can be used in addition to them the client preferred to have an underlay with increased soundproofing and damp proofed membrane – Duralay SilentFloor Gold. Good to know is that the engineered floors like this have high levels of water resistance, which combined with the DMP underlay is a guarantee for not having issues due to damp and moisture.
As you can see from the photos of this project the house appearance is completely different from this new stylish and trendy wooden floor.
before
after
Call us on 020 88309782 or book a free site visit
Our Flooring Company
Service Information
Help